All modules

Compliance & lifting

Lifting reports

The annual picture.

Inspectors and client accounts

Beyond the individual certificate, plants need the year: what was inspected, what failed, what is still outstanding. Lifting reports pull that from the same register so the annual picture is not a separate spreadsheet.

Notes and status travel with the report. Print-ready layouts mean the document that leaves the office matches what is on the system.

In this module

  • Annual lifting equipment reports
  • Report notes and status
  • Print-ready layouts
  • Built from the live register

On screen

Open this in the operations layout

The same chrome as the workshop: sidebar, tabs, live rows. Click through from here.

app.nexxus / operations

LTR · Certificate of inspection

LTR-2026-0144

Equipment
Overhead crane 10 t · Bay 3
Client
Plant A
Inspected
12 Mar 2026
Safe to use
Yes

Generated on the Nexxus Management System.

This term

128

certificates issued

6 items flagged not safe to use

Click a row. This is the live layout — web software, not a brochure.

Equipment certificates module