
Compliance & lifting
Lifting reports
The annual picture.
Inspectors and client accounts
Beyond the individual certificate, plants need the year: what was inspected, what failed, what is still outstanding. Lifting reports pull that from the same register so the annual picture is not a separate spreadsheet.
Notes and status travel with the report. Print-ready layouts mean the document that leaves the office matches what is on the system.
In this module
- Annual lifting equipment reports
- Report notes and status
- Print-ready layouts
- Built from the live register
On screen
Open this in the operations layout
The same chrome as the workshop: sidebar, tabs, live rows. Click through from here.
app.nexxus / operations
LTR · Certificate of inspection
LTR-2026-0144
- Equipment
- Overhead crane 10 t · Bay 3
- Client
- Plant A
- Inspected
- 12 Mar 2026
- Safe to use
- Yes
Generated on the Nexxus Management System.
This term
128
certificates issued
6 items flagged not safe to use
Click a row. This is the live layout — web software, not a brochure.
Equipment certificates module